What are the steps to install a prefabricated pool?
A MondePra can be installed in 7 steps, only 7! If ground conditions allow, your pool can be installed and operational in just 4 days.
Ground excavation
First you decide where the pool will be installed and there are factors to take into account. Once decided, the excavation of the land is carried out. Super important: Check the groundwater level before digging!
Land conditioning
It is time to level the hole with small gravel and level it so that the pool rests correctly on the bottom.
Pool placement and leveling
Then the discharge is given to be inserted into the hole that the workers will have excavated and leveled, leaving the pool perfectly level.
Filling the perimeter
We fill all the excess space between the pool and the excavation with gravel to avoid possible displacement. Mon de Pra pools have large reinforcements installed around them that favor the structure of the pool without canceling the positive flexibility of the material which, for example, when there is earth movement, this flexibility helps the pool not to generate any leaks or breaks.
Peripheral facilities
At this point, all that remains is to place the systems in parallel to the gravel filling. Everything is installed and connected to the filtration shed or location.
concrete band
To ensure the correct installation of your pool, we always recommend placing mesh on the concrete.
Laying the capstone
Finally, custom-made capping stones are placed for each polyester pool model.
With these 7 steps, between 3-4 days, if the terrain allows it, you can enjoy your pool.