A MondePra pool can be installed in just 7 steps. That's right, in just 7 steps! If terrain permits, your pool will be installed and ready for use in just 4 days.
What should you consider when installing a prefabricated pool?
Excavate soil
First you have to decide where the pool should be placed. Various factors must be taken into account. Once the decision has been made, the ground is dug. Very important: Check the groundwater level before digging!
Prepare the surface
Now it's time to fill the hole with grit and level it so that the pool will later rest level on the ground.
Placing and leveling the pool
Now the pool is unloaded and placed in the hole that was previously dug and leveled. The pool is now perfectly aligned.
Backfill the basin
To prevent the pool from moving, the entire cavity between the pool and the excavation is filled with grit. Mon de Pra pools are reinforced all around while maintaining the elasticity of the material. This absorbs earth movements and prevents leakage through breaks or cracks.
Lay pool technology
Now all that remains is to lay the pool technology and backfill it with grit at the same time. Everything is now laid and connected in the pump house or technical room.
Concrete strapping
To ensure the correct installation of the pool, we recommend reinforcing the concrete.
Laying the pool surround
Finally, the custom-made edging stones are laid for each polyester pool model.
If the terrain permits, these 7 steps will have you fully enjoying your new pool within 3 to 4 days.